Program check before it reaches the machine.
Units, offsets, feeds and speeds, and canned cycles are reviewed line by line. It is a code-level review. Your programmer still runs the simulation.
RoleBotz for machining. Bring estimating and production know-how to the drawing, the setup and the decisions behind a quote. Your shop supplies its machines, rates and reviewed rules.
We’ll run RoleBotz on your own part with you. Contact us to arrange sharing your drawing.
The job traveler. Can we quote this rush job with confidence?
Customer results. From manufacturing customers who use RoleBotz.
“I have never experienced a tool for manufacturing with this much potential for change and improvement.”
“It consistently catches little details that could have easily slipped past us.”
A machine shop used its estimating RoleBot to review jobs before quoting. The customer said it helped identify machining steps, material needs and required tools.
Manufacturing customer
Edited customer feedback: The replacement tool finished the rest of our 100-part order faster than we had quoted.
A shop asked its RoleBot why a cutting tool kept breaking. It suggested a different tool and fewer cutting passes. The customer said the replacement tool finished the rest of the order faster than planned.
Manufacturing customer
Customer feedback excerpted or edited for clarity and anonymity. Results reported by customers.
From drawing to decision. Follow one job from the drawing to a quote your shop can review.
Are we estimating the right revision?
Read the job. Start with the drawing and its requirements. A changed material or tolerance can change the process—not just a line in the quote.
Why it mattersMake the missing requirements visible before treating the estimate as ready.
Does the plan fit this shop?
Plan the work. Compare the proposed sequence with your machine capacity, tooling, workholding and reviewed setup preferences. An estimator or engineer validates the plan.
Why it mattersTie the estimate to the way your shop can actually make the part.
What could change the price or promise?
Review the quote. Separate one-time setup, per-part work and outside services. Keep assumptions and delivery dependencies with the estimate for approval.
Why it mattersYour expert approves the quote. Reviewed corrections can guide the next job.
Illustrative workflow · not a live run · your experts make the decisions
Knowledge meets your context. Start with the methods. Add the way your team works.
What it knows.Separate setup from run time and outside operations.
What you bring.The current drawing, material and quantity
What it knows.Check how material, tolerances and workholding affect the plan.
What you bring.Your available machines, tooling and shop rates
What it knows.Keep reviewed shop conventions available for the next quote.
What you bring.Your delivery constraints and approved setup rules
Drop the drawing in the Console, Slack or Teams. Tools, access and execution depend on your setup. Your experts review the result before acting.
The estimate, open to review. No black-box number. Run time is built from cutting, rapids, tool changes, spindle ramp and dwell, with every assumption stated and a confidence rating on the result.
Works from STEP, DXF or PDF. Scanned PDFs are flagged for a human read, not treated as clean geometry.
| Component | Time |
|---|---|
| Cutting | 18.0 min |
| Rapids | 4.0 min |
| Tool changes | 3.0 min |
| Spindle ramp and dwell | 2.0 min |
| Contingency (10%) | 2.7 min |
| Cycle time per part | 29.7 min |
| Setup (separate line) | 20 min per batch |
Assumes automatic tool changer. Confidence: plus or minus 15 to 25 percent until your machine's own parameters are loaded.
The numbers are made up, and the arithmetic checks (27.0 + 10% = 29.7).
After the quote.
Units, offsets, feeds and speeds, and canned cycles are reviewed line by line. It is a code-level review. Your programmer still runs the simulation.
Every dimension, tolerance and GD&T callout is pulled into a list for inspection sign-off. It prepares the paperwork. It does not measure parts.
First-article run time is compared to the quote, so the next quote starts closer to reality.
Start with one piece of work. Choose a real question. Add the information you authorize. Review the answer with someone who knows the job.